4th Floor Renovation, Building 700 Sacramento VA Medical Center, Department Of Veterans Affairs

AAC is serving as prime on renovation project to include the complete demolition of the 4th Floor of the hospital, followed by a full remodel and rebuild of patient rooms. The design and implementation will be used as a prototype for future hospital renovations in VA hospitals throughout the country. AAC installed in-room patient lifts, new integrated head walls and all new medical support systems. Patient and family lounges were also newly constructed. Very high-end materials were specified and installed for the renovation.

Leave a Reply